Customization: | Available |
---|---|
After-sales Service: | Other |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 22999.99/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical parameters
|
SC200/200 Frequency Construction hoists
|
Height
|
200m
|
Rated load
|
2000kg
|
Maximum capacity
|
009/009
|
Electormotor
|
11×3kw
|
Standard motion speed
|
1.1/1.35m/s
|
Cage
|
Single/Double |
max .free end height(m)
|
7.5
|
Mast section dimension
|
650×650×1508mm
|
Installation dimensions from center of rail frame to building wall
|
2800-3200mm
|
Safe and protection system
|
Upper and below limited switches,upper and below limit utmost switches,gate limited switch,falling avoiding safe device,cushion device,safe lock of gate,counterweight rope breaking or loose protecting device,safe hook,The safety device against overload,Anti-punching standard section etc. |
Q:How do your prices and quality compare to other suppliers?
A:We are the largest construction machinery manufacturer and supplier in Guangzhou, China We have our own source factory Our technicians have more than 20 years of manufacturing experience to ensure good quality Source factory first hand supply more competitive price
Q:HOW IS YOUR DELIVERY TIME?
A:In general circumstance,we can have an immediate delivery of regular machines for our clients within 15days, Because we have our own source factory and technical team to check machines in stock,locally and nation widely,and to receive machines in timely manner. But for Other suppliers it will take more than 30 days to produce the ordered machine
Q:HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
A:Our team is consisted of a group of diligent and dynamic people,working 24/7 to respond client inquiries and questions all the time.Most problems can be solved within 8 hours, while manufacturers/factories will take much longer to give response.
Q:WHICH PAYMENT TERMS CAN YOU ACCEPT?
A:Normally we can work on T/T term or L/C term,sometime D/P term. (1) On T/T term, 30% down payment is required in advance,and 70%balance shall be settled before shipment, or against the copy of original B/L for long-term cooperating client. (2) On L/C term, a100% irrevocable L/C without (2) Manufacturers/factories adjusted the machine price, because of the increasing labor cost and rawmaterial cost
Q:WHAT LOGISTICS WAYS YOU CAN WORK FOR SHIPMENT?
A:We can ship construction machinery by various transportation tools1) For 80% of our shipment the machine wil go by sea, to allmain continents such as Africa, South America, Middle EastOceania and Southeast Asia etc , either by container or RoRo/Bulkshipment.(2) For inland neighborhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, Tajikistan,UzbekistanTurkmenistan etc.. we can send machines by road or railway.3) For light spare parts in urgent demand, we can send it by intemational courier service, such as DHL,TNT. UPS. or Fedex